Ram and Shyam work on a job together for four days and complete 60% of it. Ram takes leave then and Shyam works for eight more days to complete the job. How long would Ram take to complete the entire job alone ?
- (a)6 days
- (b)8 days
- (c)10 days
- (d)11 days
Show answer and explanationHide answer
Answer: (c) 10 days
Together they do 15% a day. Shyam does the last 40% in 8 days, i.e. 5% a day, so Ram does 10% a day and alone needs 10 days.