PIB InsightsWeek of 8 Jun – 14 Jun 2026 · Prelims · Infrastructure, Transport, Energy, Digital public infrastructure
Infrastructure at the core of India's development: rail, roads, ports, power and digital
Public capital expenditure, about ₹2 lakh crore in FY2014–15, reached ₹12.2 lakh crore in FY2026–27 as integrated planning expanded transport, housing, water, energy and digital infrastructure.
Source: Press Information Bureau (PIB), Government of India
Prelims:EconomicsPolicies & Schemes
On 9 June 2026, PIB published a backgrounder on infrastructure at the core of India's development, covering transport, housing, water, energy, logistics and digital networks. After 2014, it says, planning became integrated rather than fragmented project by project, and public capital expenditure went up to ₹12.2 lakh crore in FY2026–27, from about ₹2 lakh crore in FY2014–15.
Railways. Budgetary support rose from about ₹32,000 crore in 2014–15 to ₹2.78 lakh crore in FY2026–27, nearly nine-fold, and electrification reached 99.6% of the network by March 2026, against about 20% before 2014, with 69,873 route km electrified. As of April 2026, 162 Vande Bharat services run; the Vande Bharat Sleeper (January 2026) recorded 100% occupancy, carrying 1.21 lakh passengers on 119 trips in its first three months; and 60 Amrit Bharat Express services serve low- and middle-income families. The 508 km Mumbai–Ahmedabad High-Speed Rail corridor, under construction, is designed for up to 320 kmph, and the Union Budget 2026–27 announced seven new high-speed rail corridors. Under the Amrit Bharat Station Scheme (2023), 208 of 1,338 identified stations have been redeveloped, and punctuality has improved to over 77%. Kavach, the indigenous automatic train protection system that applies brakes automatically to prevent collisions, covers 3,103 route km with work under way on 24,427 km, and is fitted on 4,277 locomotives; Kavach 4.0 has been commissioned on Delhi–Mumbai, Delhi–Howrah and Prayagraj–Kanpur, and train accidents fell from 135 in 2014–15 to 16 in 2025–26. Under PM GatiShakti, 139 cargo terminals are operational and 300 more locations approved. Landmark works of 2025: the Chenab Bridge, 359 metres above the river and the world's highest railway arch bridge; the Pamban Bridge, India's first vertical-lift railway sea bridge, linking Rameswaram with the mainland; the 51.38 km Bairabi–Sairang line to Mizoram through 45 tunnels; and the Anji Khad Bridge, described as India's first cable-stayed railway bridge in Jammu and Kashmir.
Roads. At 63.73 lakh km, India has the world's second-largest road network. National highways now run to 1,46,572 km (March 2026), up about 61% from 91,287 km in FY14; four-lane-and-above highways from 18,371 km to 45,516 km; and 3,644 km of access-controlled expressways are operational. PMGSY, allotted ₹19,000 crore in 2026–27, has connected 99.6% of eligible habitations; completed roads were 3.86 lakh km in 2000–2014 and 4.11 lakh km in 2014–2026, and completed bridges rose from 484 to 10,293. Bharatmala Pariyojana (2017) had completed 22,590 km by 31 March 2026. Landmark projects include the 12-km Z-Morh/Sonamarg Tunnel (2025); Sudarshan Setu (2024) between Okha and Beyt Dwarka; Maitri Setu (2021) over the Feni River linking Tripura with Bangladesh; the 9.02-km Atal Tunnel (2020), the world's longest highway tunnel above 10,000 feet, which bypasses the Rohtang Pass to give all-weather access between Manali and Lahaul-Spiti; the Dr. Syama Prasad Mukherjee (Chenani-Nashri) Tunnel (2017); and the 9.15-km Dhola-Sadiya Bridge (2017), the first permanent road link between Assam and Arunachal Pradesh. Recent works include the 109 km Ahmedabad–Dholera Expressway, the 213 km Delhi–Dehradun Economic Corridor, which cut travel time from over six hours to about 2.5 hours and has Asia's longest elevated wildlife corridor, and the 76 km Urban Extension Road-II, Delhi's third ring road.
Aviation and metros. Operational airports rose from 74 in 2014 to 165 in 2026. UDAN (2016) has 665 routes connecting 95 airports, heliports and water aerodromes, serving over 1.64 crore passengers, and the Modified UDAN scheme (2026, ₹28,840 crore) aims to connect 120 new destinations. Twenty-five greenfield airports have been approved since 2014; Digi Yatra works at 38 airports; and GAGAN (2015) is the world's first equatorial Satellite-Based Augmentation System. The metro network grew from 248 km in 2014 to over 1,155 km in 2026, the world's third-largest, in 26 cities, with daily ridership above 1.15 crore. Kolkata opened India's first underwater metro tunnel beneath the Hooghly in 2024, Kochi's Water Metro links 10 islands with electric hybrid boats, and Namo Bharat (2025) on the Delhi–Meerut corridor uses ETCS Hybrid Level-III signalling.
Ports and waterways. Maritime routes carry 70% of India's trade by value and about 95% by volume. Major ports' capacity has nearly doubled, to 1,726 MMTPA in 2026 from 873 MMTPA in 2014; cargo rose from 581 MMT to 915 MMT; vessel turnaround time fell from 94 to 48.8 hours; and the operating ratio improved from 65% to 41%. Sagarmala (2015) has completed 78 projects worth ₹5,356.75 crore. National Waterways grew from 5 in 2014 to 111 in 2026, spanning 20,187 km in 23 States and 4 UTs, with 32 operational and cargo up from 29 MMT to 218 MMT. Indian-flagged ships rose from 1,250 to 1,593 and seafarers from 1.27 lakh to 3.20 lakh. On NW-1 (Varanasi–Haldia), the Jal Marg Vikas Project raised cargo to 16.38 MMT in 2024–25, from 5.05 MMT in 2014–15, and under Arth Ganga (JMVP-II), 66 community jetties serve about 1.22 lakh users daily; India's first hydrogen fuel cell vessel began operating in Varanasi in December 2025.
Industry and logistics. The GIS-based India Industrial Land Bank maps 4,220 industrial parks over about 6.98 lakh hectares; around 272 plug-and-play parks operate; 20 industrial smart cities have been approved across seven corridors; and the BHAVYA scheme (March 2026) envisages 100 new plug-and-play parks. Proposals in the Union Budget 2026–27 include three chemical parks, seven PM MITRA parks and the ₹10,000 crore Biopharma SHAKTI programme. The PM GatiShakti National Master Plan (October 2021) is a GIS-based platform bringing together planning across 58 Ministries and Departments with over 3,202 data layers; under the National Logistics Policy (September 2022), India's World Bank Logistics Performance Index rank improved from 54 in 2014 to 38 in 2023, and India aims to enter the top 25 by 2030. ULIP (2022) integrates logistics data from many ministries on one interface; NETC FASTag (2016) accounts for over 98% of highway toll collection; and PRAGATI (2015) has reviewed 382 projects worth over ₹85 lakh crore and resolved 2,958 issues.
Water and housing. The Ministry of Jal Shakti (2019) brought drinking water, sanitation and water resources under one framework. Under the Jal Jeevan Mission (2019), rural tap connections rose from 3.23 crore households (about 17%) at launch to about 15.86 crore (81.94%) by June 2026, and the mission has been extended till 2028 for universal coverage; the Ken–Betwa Link Project (2021) is India's first river interlinking project under implementation, for drought-prone Bundelkhand, and the Dam Safety Act, 2021 strengthened water governance. Under PMAY-Urban (2015), about 98.10 lakh of 125.31 lakh sanctioned houses were complete by May 2026, against 8.04 lakh built in 2005–2014; PMAY-U 2.0 (September 2024) aims at one crore more urban beneficiaries by 2028–29, and about 96% of its houses were allotted to women. PMAY-Gramin (2016) aims at 4.95 crore rural houses by March 2029; 3.91 crore have been sanctioned and 3.06 crore completed, and about 75% of beneficiaries are women. The SWAMIH Fund (2019) has delivered over 63,000 stalled homes, and AMRUT and AMRUT 2.0 projects worth about ₹2.79 lakh crore have been sanctioned since 2015.
Energy. Power shortage fell from 4.2% in 2014 to 0.03% in 2025–26; rural supply rose from 12.5 to 22.6 hours a day; DISCOMs moved from losses of ₹67,962 crore (FY2013–14) to profits of ₹2,701 crore (FY2024–25); and installed capacity reached 532.74 GW by March 2026, against 248 GW in 2014. India met its COP21 target of 40% non-fossil electricity capacity nearly a decade early and has the world's 3rd largest clean energy and 4th largest wind capacity. PM Surya Ghar: Muft Bijli Yojana (2024) aims at rooftop solar for one crore households; Saubhagya (2017) electrified nearly 2.86 crore households; the International Solar Alliance, spearheaded jointly with France, has 125 members; and the Global Biofuels Alliance, launched during India's G20 Presidency, has 33 countries and 14 international organisations. LPG coverage rose from 55.9% in 2014 to 107.2% in 2026 and consumers from 14.51 crore to 33.39 crore; PMUY (2016) beneficiaries took about 49.21 crore refills in FY2025–26, and their average annual refills rose from 3.68 to 4.71.
Digital. Internet connections grew nearly fourfold, from 25.15 crore in 2014 to 100.29 crore in 2025, and broadband from 6.1 crore to 99.56 crore; PM-WANI (2020) has over 4.10 lakh Wi-Fi hotspots; and 5G, launched in 2022, reaches 99.9% of districts and about 85% of the population. Aadhaar numbers rose from 63.22 crore to over 144 crore and Jan Dhan accounts from 14.72 crore to 57.71 crore, while UPI processed about 2,264 crore transactions worth over ₹29.53 lakh crore in March 2026; DigiLocker has 68.91 crore+ users and Common Service Centres grew from 0.83 lakh to over 5.01 lakh.
Source
- Infrastructure at the Core of India’s Development · Source: Press Information Bureau (PIB), Government of India, 9 Jun 2026