PIB InsightsWeek of 27 Apr – 3 May 2026 · Prelims · Nuclear energy, PFBR, Thorium, SMRs
PFBR reaches first criticality: India enters stage two of its nuclear programme
The indigenous 500 MWe Prototype Fast Breeder Reactor at Kalpakkam reached first criticality, starting the second stage of India's three-stage nuclear programme.
Source: Press Information Bureau (PIB), Government of India
Prelims:Science & Technology
On 27 April 2026, Union Minister Dr Jitendra Singh told a workshop of MPs and MLAs on Small Modular Reactors that, once the PFBR is fully operational, India will be the second country after Russia to run a commercial-level fast breeder reactor.
The milestone: the Prototype Fast Breeder Reactor (PFBR), a 500 MWe reactor of Indian design at Kalpakkam, Tamil Nadu, reached first criticality on 6 April 2026. The Indira Gandhi Centre for Atomic Research (IGCAR) developed it and BHAVINI built it.
Why it matters: the PFBR begins the second stage of India's three-stage nuclear power programme. It burns uranium-plutonium mixed oxide fuel and breeds more fuel than it consumes. This allows more efficient use of nuclear fuel and opens the way to using India's vast thorium reserves in the third stage.
The global picture: Russia is the only country running commercial fast breeder reactors today, with India at an advanced stage of commissioning its own. The USA, UK, France, Japan, Germany and China built or ran experimental fast reactors, but most of those programmes have since shut down. Only a few countries have advanced in this technology, which the Minister said places India in a distinguished position.
Targets: nuclear energy will play a crucial role in the clean energy transition, particularly in reaching 100 GW of nuclear capacity by 2047. The Minister added that AI, data infrastructure and advanced manufacturing will need steady, clean power, for which nuclear power will be indispensable. A balanced mix of nuclear, renewable and other clean sources is key to Net Zero by 2070.
Nuclear Mission and SMRs: under the recently launched Nuclear Mission, with an allocation of ₹20,000 crore, five Small Modular Reactors (SMRs) are planned by 2033. SMRs will be useful for captive power generation, particularly for industry, densely populated zones and remote areas off the grid, and for repurposing thermal plants. The SHANTI Act opens the way for greater private sector participation in expanding nuclear capacity.
Source
- After Russia, India to be the second country in the world operating a commercial-level Fast Breeder Reactor; an indigenously designed Prototype Fast Breeder Reactor (PFBR) achieving first criticality is a significant milestone: Dr Jitendra Singh · Source: Press Information Bureau (PIB), Government of India, 27 Apr 2026