Carpenter A can make a chair in 6 hours, carpenter B in 7 hours and carpenter C in 8 hours. If each carpenter works for 8 hours per day, how many chairs will be made in 21 days?
A and B can complete work together in 5 days. If A works at twice his speed and B at half of his speed, this work can be finished in 4 days. How many days would it take for A alone to complete the job?
50 men or 80 women can finish a job in 50 days. A contractor deploys 40 men and 48 women for this work, but after every duration of 10 days, 5 men and 8 women are removed till the work is completed. The work is completed in:
A conveyer belt delivers baggage at the rate of 3 tons in 5 minutes,
and a second conveyer belt delivers baggage at the rate of 1 ton in 2
minutes. How much time will it take to get 33 tons of baggage delivered
using both the conveyer belts ?
Water is filled in a container in such a manner that its volume
doubles after every five minutes. If takes 30 minutes for the container to be
full, in how much time will it be one-fourth full ?
Ram and Shyam work on a job together for four days and complete 60% of it. Ram takes leave then and Shyam works for eight more days to complete the job. How long would Ram take to complete the entire job alone?
A group of workers promise to complete a piece of work in 10 days, but five ofthem do not report for work. If it took the remaining workers 12 days to complete the work, then the number of workers originally hired was
Two taps can fill a tank separately in 20 minutes and 30
minutes respectively. If both the taps are opened simultaneously,
then the tank can be filled in